2003_layout_pics

May_2003 For this first session, Mike was handling all the reefer movements and Pearre handled everything else.

For this first session, Mike was handling all the reefer movements and Pearre handled everything else.

May_2003 Here are my first two victums. On June 4, Pearre and Mike were kind enough to come over on a Wednesday and kick the tir

Here are my first two victums. On June 4, Pearre and Mike were kind enough to come over on a Wednesday and kick the tires.

May_2003 Mike is busy at the packing sheds. I used the house tracks a cleaning tracks and the Team tracks as a make do ice house

Mike is busy at the packing sheds. I used the house tracks a cleaning tracks and the Team tracks as a make do ice house. Like the prototype, the real ice house will be near the East Lewiston Yard.

May_2003 No harm, I hadn't paid him for those cars yet. The next day I started building the East Lewiston yard.

No harm, I hadn't paid him for those cars yet. The next day I started building the East Lewiston yard.

May_2003 Pearre checks out his cut in front of the passenger depot. I have scrounged up several stand in buildings to give opera

Pearre checks out his cut in front of the passenger depot. I have scrounged up several stand in buildings to give operators a target.

May_2003 The next day, Blair came over with some of his steam era rejects and he got a little close to the edge.

The next day, Blair came over with some of his steam era rejects and he got a little close to the edge.

OCT_29_03 A rare sight on the Camas Prairie is this UP FM H15-44.

A rare sight on the Camas Prairie is this UP FM H15-44.

OCT_29_03 Blair and Lance switched the downtown local while Ken and Alf handled the reefer movements.

Blair and Lance switched the downtown local while Ken and Alf handled the reefer movements.

OCT_31_2003 Ken, Alf, Blair and Lance came over 10/29/03 for my second op session. This time with the East Lewiston Yard.

Ken, Alf, Blair and Lance came over 10/29/03 for my second op session. This time with the East Lewiston Yard.

Sept. 2003 Here is the yard under construction.

Here is the yard under construction.

The same end on April 9, 2003.

The same end on April 9, 2003.